DYNAMIC POWER ORCHESTRATOR · AI DATA CENTERS

Puissance logicielle pour le
rack IA.

DPO est le plan de contrôle au niveau du rack qui anticipe les transitoires de puissance IA et orchestre la sortie BBU + PSU pour la conformité réseau — sans compromettre le débit GPU.

LE PROBLÈME

La conformité réseau est devenue un problème de contrôle continu.

AI training and inference loads create power transients on millisecond time scales. Grid operators have responded with mandatory ride-through and recovery requirements: ERCOT NOGRR 282 from 2028/01, with comparable rules converging across seven other DC-heavy jurisdictions and a federal NERC layer.

In July 2024, six large data centers in Texas tripped offline simultaneously during a grid disturbance — exposing the gap between current ORv3 rack power design and grid interconnection requirements. The window for rack-level orchestration is the next 24 months.

Lire le paysage de la conformité →

CE QUE NOUS CONSTRUISONS

Deux couches coordonnées. Une boucle fermée.

Plan de contrôle logiciel

DPO Engine

Forecasts GPU load ahead of the transient. Computes setpoints for the rack power shelf. Runs as a software process alongside the workload scheduler.

Interfaces: Redfish · PMBus · OCP ORv3 PMI

En savoir plus →

Module matériel monté en rack

DPO Gateway

Pin-compatible replacement for the PMI module. Coordinates BBU discharge and PSU output shaping in real time. Designed against ORv3 PMI Specification 1.0.

Format: OCP ORv3 PMI-compatible · Cert target: UL + OCP 2027 Q4

Voir les spécifications →

CONFORMITÉ

Nous suivons la fenêtre réglementaire pour vous.

DPO est conçu contre les huit juridictions appliquant des exigences de traversée de tension et de récupération de puissance active post-défaut pour les grandes charges entre 2026 et 2028.

Région Autorité Réglementation Calendrier
US — Federal NERC Reliability Guideline + Standards Project RG publié mai 2026
US — Texas ERCOT NOGRR 282 + NPRR 1308 Application complète 2028/01
US — California CAISO Large Loads Technical Requirements Straw Proposal avril 2026
Canada — Ontario IESO TR for Large Computational Loads v1.0 Publié 2026-05-01
Europe ENTSO-E / national TSOs Grid Code (RfG / DCC) Suppléments RTE / TenneT en cours
Voir le paysage de conformité complet →

ARCHITECTURE

Prévoir, orchestrer, se conformer.

DPO sits between the data center EMS and the ORv3 rack — predicting the transient, computing the setpoint, and enforcing the envelope at the shelf. Inline with ORv3 PMI specification, brand-neutral when contributed to the OCP open spec.

DATA CENTER EMSFleet scheduler · workload orchestratorPOWER GRIDDemand · capacity · frequency schedulerDPO ENGINE — CONTROL PLANEML-driven rack-level power predictionVRT POLICYVoltage ride-through envelope enforcementPFAPR RECOVERY CONTROLPost-fault active power recovery slopeCONTROL PLANEDPO GATEWAY — SHELF PMI EXTENDRack-mounted power orchestration moduleVRT EDGE POLICYLocal VRT enforcementBBU/PSU ORCHESTRATORDischarge + output shapingRACK POWER PREDICTIONSub-ms transient forecastTELEMETRY AGGREGATORFleet data collectionAC INPUTGrid powerORv3 RACKACPOWER SHELFAC → DC conversionDPO48V DC48V DC BUSBBU SHELFStandard backupCharge ⇄ dischargeDPOBBU — VRT/FRT/PFAPRGrid compliance eventsCharge ⇄ dischargeDPOAI SERVER ×6+GPU compute load
DPO Gateway Specification — contribution ouverte de XMight à l'OCP
Voir le détail de l'architecture →

TRACTION

Où nous en sommes.

XMight is a member of the OCP Startup Program 2026, holds US patent US12510873B2, and is currently in pilot deployment with a North American Edge AI data center operator.

Parler à l'équipe avant que 2028 ne devienne cette année.