New grid ride-through requirements put costly central UPS back on the table.
There's another way: Rack-Level Power Orchestration (POM).
90-second cut of the booth loop. Tap full screen and turn your phone sideways to read the charts. Watch on YouTube ↗
Simulation · design target. Illustrative rack-level model, not measured data; hardware validation pending.
Grid requirements: OCP Base Specification v1.0.0, Interface Specification Between Hyperscalers and Utility Grid for Disturbance Performance (effective Sept 17, 2026).
POM is an open specification proposed to OCP Rack & Power.