XMight at OCP Global Summit 2026 — what we showed in the Innovation Village

We demonstrated "No Central UPS, Still Grid-Code-Ready" in the OCP Innovation Village (FTS – Power), San Jose, 12–15 October. The 90-second simulation and what we talked about with rack-power, storage and grid engineers.

XMight at OCP Global Summit 2026 — what we showed in the Innovation Village
POM: an open rack-level coordination interface in the ORv3 power shelf, contributed to OCP Rack & Power.

XMight Smart Energy exhibited at the OCP Global Summit 2026, San Jose Convention Center, 12–15 October, in the Innovation Village (FTS – Power, station FN-089).

What we showed

Demo: "No Central UPS, Still Grid-Code-Ready." Innovation Village booth FN-089. Listed by OCP in FTS – Power, Power Delivery track: an open, vendor-neutral rack-level coordination layer for meeting grid codes without a central UPS, extending several OCP power specifications. See the OCP demo lineup

If we met at the booth and you want the simulation assumptions, the PSU timing references or the POM draft, write to us.

POM — Power Orchestration Module. An open, rack-level coordination interface that lets ORv3 / ORW racks ride through grid disturbances and recover on the operator's clock, using the energy stored in the rack architecture — PSU hold-up and BBU in ORv3, BBU/CBU in a Mt Diablo sidecar. POM is XMight's contribution to the OCP Rack & Power project and is in review.

XMight POM Module and POM Manager. XMight's implementation of POM: a facility-level Manager that sets the power envelope, and a rack-mounted Module that enforces it autonomously in the power shelf.

Watch the 90-second booth demo → · On YouTube

Why it matters now

On 10 July 2024 a faulted transmission line in Northern Virginia moved about 1,500 MW of data-center load to backup power; on 22 July 2026 a similar fault moved about 3,800 MW. ERCOT NOGRR 282 has been in force since 1 August 2026; SPP, IESO and other operators have adopted or drafted comparable rules; NERC is drafting continent-wide standards; and inside OCP, the DCF Interface Specification for Disturbance Performance (V1.0.0, September 2026) now states the same commitment at the point of interconnection.

Who we want to keep talking to

  • Engineers reviewing or implementing rack-level ride-through — join the POM review in OCP Rack & Power.
  • Grid operator and ISO engineers working on large-load ride-through, recovery and evidence requirements.
  • ORv3 / ORW operators planning capacity for 2027 who want to know what the power shelf has to do to pass.

Continue the conversation →